OCTOBER 1978
747 EAST BETHANY HOME ROAD
HOMEOWNER’S MEETING AND NOTES - October
1978
1.Corrections to notes of September meeting- new Board of Directors
until January 1, 1979:
President Mr. Paul Phillips
Vice-President Mr. Tom
Lysaght
Treasurer Mr.
Bill Fletcher
Secretary
Ms. Becky Johannes
Board
members
Ms. Donna Moore
Mr. Dave
Cronin Mr. Bruce Johannes
Mr. Don Bower Ms. June Nash
Ms. Marie
Martel Mr. Fred Woodworth
Mr. Dave Kelly
2. Current business –
a.
If
association dues are raised, First Federal needs to be notified by October 15,
1978 or we will pay $5 per unit after that.
b.
Pool
– Heating the pool for the cooler months was discussed. It was suggested that
the pool be heated on weekends only. (Last year the added cost of keeping it
heated one month in the fall and approximately three and one half weeks in the
late spring was around $125 over the average.) The subject will be on the
agenda for the next meeting.
c.
Gas
leaks – The line to the south gas lamps is leaking due to rusting of pipes.
There is a significant leak also at the Bower unit. It was suggested that we
have the gas lamps electrified to alleviate this problem.
d.
It
was suggested that we all check our heater pilot lights and heater operation.
The wind can blow the pilot light lights out. If a homeowner wants to shut down
the pilot light to save on gas bills, the igniter should be disconnected also.
(Walt will supply notes regarding this.)
e.
Roofs
- The roofer called regarding the need to update the list of roof discrepancies
and to bring this to the roofer's attention. It will be approximately one month
before the roofer will be out to finish the remaining damaged roofs.
f.
Drywall
- Mr. Garcia inspected the severely damaged ceilings and walls on October 3,
1978. His estimate on the damage for four items (Cronin, Martel, Johannes &
McFadden) was $600. His price on retaping and painting carport ceilings was
$110 per unit. It is possible the damage under carport roofs is due to humidity
rather than rain. Carports have not been inspected by roofer (not on original
list of damage). A vote was held to have Duncan inspect the tops of roofs of
carports to assure there is no structural damage, which would cause the
undersides to become damaged after they are repaired. The motion was passed and
Bruce volunteered to call Duncan and have the inspection done. It was suggested
that the interior seams of the undersides of carports be redone with molding
placed around the perimeter. (There are approximately nine units with
carports.)
g.
Insurance
- Donna reported that insurance companies would not make bids outside of 30 to
45 days of the renewal date for our policy. It was suggested that we get
someone with insurance experience to advise our association. Possibly someone
from another homeowners' association.
h.
Robbery
- It was reported that we had one more robbery in our community last week. The
attempt was discussed. Most have been happening in the front units through
forced entry at the front door. We should all be on the alert for unfamiliar vehicles
driving around our drive and to get license plate numbers.
i.
CC&R’s
– It was suggested that our CC&R’s be reviewed and changed to address:
1.
Deteriorating
entrance doors on detached garages.
2.
a
“townhouse community”, As they read now, this is considered a condominium
complex. (An error by Blankenship)
3.
provision
for approval of fireplace installation.
j. Fireplaces - Dave and Walt will work on
minimum guideline standards for the construction of new fireplaces to be approved by the board. It was suggested
that we have the guidelines in addition to the C.C. & R. 's which would
need the approval of 20 homeowners.
k.
Sprinkler
systems – Don Girard gave a talk and made suggestions regarding our sprinkler systems.
Our equipment is adequate with
electrical controls but the wiring needs overhauling. He gave a report on
individual valves and wiring. His suggestions were to: Rewire, repair
malfunctions and to replace damaged parts.
He will need to subcontract for the needed asphalt cutting. It is
estimated it will take two or three men forty working hours (after the asphalt
is removed) @ $10 per hour. His rough estimate for wiring - $1,000, labor -
$800, and solenoids $300. The estimate comes to approximately $3,000 including
the asphalt cutting. This cost would be duplicated again in five years. It was
suggested that we need a lightning grounding device, as our clock has been hit
twice in the last two months. Controllers for individual units were discussed
and would cost around $49 per unit. These would not be guaranteed as compared
to the common system, which would be. This individual system would be feasible
but have to be set to operate in sequence. Rewiring for these individual
clocks would be $25 per unit. Paul requested from Don a written rough estimate
on time and materials for rewiring the controller (community), repairing the
valves, servicing the clock, etc. It was brought up that our present landscaper
is paying for repairs on our sprinkler system that should not be his
responsibility.
l.
It
was suggested that we have both gas and sprinkler problems taken care of at the
same time so that we don't have to
have the drive torn up twice.
m.
Donna
is to report on the possibility of our insurance covering the lightning damage
to our sprinkler system's clock.
n.
Trellises,
arbors and sunshades/roofs - To be reviewed at next meeting
3. Project workdays - It was
generally agreed to be a good idea to have workdays scheduled for certain
projects around the complex. Dave, Marie and Howard will put together a
calendar to let people know what project is to be done when. It was suggested
that we have a back-up project in case we have a larger turnout than
anticipated.
4. Paul recommended that we
try capping the railroad ties before re- placing them to see how it looks.
5. Pool Entrance - Changing
the location of the gate to the pool area was discussed. It was suggested that
the present location is inconvenient, but to change it to open onto the drive
may be hazardous due to traffic. Not a priority item.
6. Exterior painting - Paint
(stucco) needs patching and matching. Don Bower volunteered to get an estimate
and information on painting the spackle on the complex by next summer. (It was
suggested that we charge a special assessment for all pertinent problems for
next year.
7. Fences - Fences in
general need to be sealed and oiled. The suggestion was made for us to install
bubblers in lieu of sprayers inside our fences so they wouldn't get so water
stained. The inside of the fences need to be sealed and oiled at the same time
as the outside to protect both.
8. Trees - A
discussion was held regarding the eucalyptus trees. Don volunteered to top the
trees.
9. The
problem of one unit having a large hole in the wall which is unsightly to the
neighbor was discussed. Bill suggested that the neighbor have the hole repaired
and send the association the bill, which would in turn place a lien on the
property of the party
refusing to
fix the hole.
10. A special
board meeting has been called and will be held at 7:00 P.M on October 12 to
discuss fireplace construction standards
11. Action
Items -
a.
Walt
– LETTER TO place III (walls and paint)
b.
Donna
– Insurance regarding lightning.
c.
Dave/Bruce
– Roof estimates – Interiors – Carport roof inspection.
d.
Dave/Walt
– Fireplace minimum standards.
e.
Don - SPACKLING AND PAINTING.
f.
Paul
– Sprinkler repair/landscaping